Project Details

  • Full concrete package, labour and materials including concrete supply
  • Joint venture with Brilliance Steel to include reinforcing and concrete formwork under one contract
  • Ground beams
  • 350m3 of ground beams concrete were poured within 4 weeks.
  • In situ lift core concrete and associated formwork
  • Slab on grade
  • Rib and infill place and concrete topping placement
  • Precast columns installation and drossbach grouting